The local layer for North Africa's data centres.

Tested optics, copper and fibre cabling, and open Ethernet switches — installed, stocked and supported from Casablanca. We also bring a power and water model that keeps a site inside its grid limit on the hottest days.

Optics 10G–400G · Open switching · Installation · Energy

Robust schedule · test run5,000 simulated days

Days breaching the grid limit

%

01Unmanaged
100%

Flat load, chillers only

02Forecast-only
68%

Optimized on the forecast

03Robust, Γ = 6
0%

Guarded hour by hour

0

grid-limit breaches

US$7/day

cost of robustness, 0.04%

200m³

water per day

Illustrative run: a 10 MW-class site, a Gulf summer day, invented prices and limits. It shows the method, not a saving we promise.
10G–400G
Tested transceivers and cabling
Open
White-box switching, open NOS
4
Support languages: AR, FR, IT, EN
0
Grid-limit breaches in the test run
01What we do

Supply, install, then take the power bill seriously.

Hardware resale carries thin margins. The durable part of this business is what happens after the boxes arrive: the installation, the spares, the support contract and the plan that keeps the site inside its limits.

01Supply

Optics, cable and switches

Tested 10G–400G transceivers, copper and fibre cabling, and open white-box switches running an open network operating system. Sourced from factories in Thailand, Vietnam and Malaysia, and tested again before they ship to you.

  • 10G to 400G optics
  • Copper, DAC, AOC and MPO fibre
  • Open switches, open NOS
02Install

Cabling, labour and local support

The part that cannot be shipped in a box: site surveys, structured cabling, installation labour, labelling, testing and on-site support, with spares held in the region so a replacement is days away, not weeks.

  • Site survey and cabling plan
  • Installation labour on site
  • Spares and returns in-region
03Optimize

Energy audit and optimization

A day-ahead robust schedule that decides when deferrable compute runs and where the heat goes, so a hot-climate site stays inside its grid limit and its water budget on days hotter than forecast.

  • Power and water, hour by hour
  • Guarded against forecast error
  • Pilot on one year of site data
02Energy model

A distributor that sells the power plan with the hardware.

Most distributors sell boxes and leave the utility bill to the buyer. Our energy service starts from the constraint that actually stops a site: the grid connection limit on the hottest afternoon of the year.

What it decides, hour by hour

  • When deferrable computing — AI training, batch work — actually runs.
  • How much heat goes to mechanical chillers, which draw more power as it gets hotter.
  • How much heat goes to evaporative cooling, which draws little power but consumes water.

What it protects

  • The grid limit, in every hour, against the full forecast error (4 °C in the test).
  • Cost against the worst hours, where Γ sets how cautious the plan is.
See the method in full
A distributor that sells the power plan with the hardware.
PlanMean cost / dayDays breachingWorst breachWater
Unmanaged: flat load, chillers onlyUS$19,290100%3.40 MW0 m³
Optimized on forecast onlyUS$15,93368%0.40 MW200 m³
Robust, Γ = 6US$15,9400%0.00 MW200 m³

The robust plan costs 0.04% more than the forecast-only plan and never breaches the limit. The 17% gap to the unmanaged case is not a sales claim: that baseline has no evaporative cooling, and the prices and limits are invented. All inputs are illustrative placeholders, not site measurements.

03Why Morocco

The pipeline is announced. The local layer is not built.

Morocco reports about 1.5 MW operating against a pipeline announced near 2 GW. The Nexus AI Factory near Nouaceur is the anchor: a reported MAD 12 billion programme, 16 MW at Nouaceur and 20 MW in the north planned for 2027, with a 500 MW long-term goal. Most of that consortium is foreign. The cabling, the labour, the spares and the on-site support have to be local — and that is the layer we are building.

Markets and buyers
1.5MW

Operating in Morocco

BMI, Q2 2026

~2GW

Announced pipeline

Public reports, 2026; figures vary by source

36MW

Nexus phases planned for 2027

16 MW Nouaceur + 20 MW in the north

500MW

Nexus long-term goal

Reported, not built

04How we work

Four steps, and no inventory before the third.

Announced is not built. We would rather lose a quarter than buy stock against a project that slips.

  1. 01

    Brief

    Site, capacity, timeline and what already exists. One call, or a short written brief.

  2. 02

    Bill of materials

    Tested equivalents, compatibility notes, lead times and a landed price in Morocco.

  3. 03

    Letters of intent

    Three signed letters of intent from named buyers or integrators come before the first purchase order.

  4. 04

    Deliver and support

    Staged shipments, installation labour, spares held locally, and a support contract with a named engineer.

Start a conversation

Tell us what the site needs.

Send the country, the capacity and the timeline. You get a bill of materials, a landed price and — if the site runs hot — the scope for a pilot energy audit.