Skip to content
03Markets

Morocco first. Then Egypt, Tunisia and Algeria.

We start where a funded project has dates and where the local layer is thin. Casablanca is the launch market; Egypt is the second. Every market is scored on the same three tests: land, energy contracts and connectivity.

Launch market
Morocco — Casablanca first
Second market
Egypt
Second wave
Tunisia, Algeria
01Who buys

Six buyers, one requirement: a supplier who answers locally.

Hyperscalers buy direct and are not the target. Our buyers are the ones who need a tested part, a warranty they can enforce, and a technician who can be on site this week.

  • 01

    Colocation operators

    Mid-size operators building or expanding a hall, who need optics and cabling without a hyperscaler's lead time.

  • 02

    Telcos

    Network and edge builds where an open switch and a tested optic beat a locked-in line card.

  • 03

    Banks

    In-country data halls with strict procurement and a warranty that has to be enforceable locally.

  • 04

    Universities and research

    Campus and HPC clusters connecting to national and regional AI capacity.

  • 05

    Government cloud projects

    Sovereign hosting programmes that must show local procurement and local skills transfer.

  • 06

    System integrators

    The channel we sell through: integrators who want a stock-holding partner behind their installation.

02The map

Very little is running. A great deal is announced.

North Africa has the largest announced pipeline in Africa and one of the smallest operating bases. That is the opportunity and the timing risk, in one sentence.

MarketOperating todayAnnounced pipelineOur position
Morocco14 facilities, about 1.5 MW operationalPlans near 2 GW, including the Nexus AI Factory near Casablanca (500 MW goal)Launch market. Casablanca first.
Egypt14 facilities, about 60 MWAbout 20 MW firmly committed; 400–500 MW announced but unfunded; Khazna 25 MW in Cairo due Q3 2027Second market. More running sites to sell into now.
Tunisia and AlgeriaNo reliable public figuresAlgeria described as rampingSecond wave. Entered through integrators.
Africa overallAbout 360 MW active load238 MW under construction, 656 MW plannedThe whole continent is smaller than one large Gulf campus.

Figures from public 2026 reports — BMI via Le360, EnterpriseAM, ADCA 2026. They vary by source and move quickly: read them as context, not as a forecast.

03The anchor

The Nexus AI Factory, near Nouaceur.

The project that settles the launch market. Reported detail, not our own claim — and we are not counting on selling switches into the factory itself.

The local layer

Cabling, installation labour, spares and on-site support for the developers and their contractors. The consortium is largely foreign; a Moroccan operation with Moroccan staff fills a gap the project will be judged on.

The ecosystem, not the factory

The programme includes a centre of excellence and an innovation hub. Universities, ministries and companies connecting to it need ordinary Ethernet gear. AI systems of this class usually arrive with the vendor's own networking, so we do not count on the core.

The energy argument

The site is liquid-cooled and promised 100% renewable power. Both belong in the model before it is shown to anyone connected to the project — and the same model is what a utility or regulator needs to see.

Reported detail

Agreement
Memorandum of understanding, 8 April 2026, GITEX Africa, Marrakech
Money
MAD 12 billion, about US$1.29 billion, across two phases
Capacity
16 MW at Nouaceur and 20 MW in the north, both planned for 2027; 180 MW platform target and a 500 MW long-term goal
Who
Nexus Core Systems leads; Naver Cloud operates; Nvidia supplies the technology; Lloyds Capital finances; FiveNines Group oversees development; TAQA Morocco supplies renewable power
Hardware
Nvidia Vera Rubin NVL72 systems with liquid cooling
Track record
A 40 MW first phase, originally expected in early 2026, has slipped
04Second market

Egypt: more running sites, a funding gap above them.

Egypt reports about 60 MW operating across 14 facilities — more live capacity than Morocco today. About 20 MW is firmly committed; 400 to 500 MW is announced but unfunded, and Khazna's 25 MW in Cairo is due in Q3 2027. The power argument is different here: gas supply is under strain, and buyers are being asked to prove efficiency rather than capacity.

  • Sell into operating sites first, where the budget already exists.
  • Lead with spares and support, not with price.
  • Put the energy audit where the grid is the constraint.
05Second wave

Tunisia and Algeria, when a named project exists.

There are no reliable public figures for either market. We enter through integrators rather than directly, and only once a named project with a budget is visible. The same three tests apply: land, energy contract, connectivity.

06The channel

Sell beside the channel, not against it.

Regional distributors already reach thousands of partners across North and West Africa. We are not trying to replace them. We hold stock, test every batch and put technicians on site — and we are content to do that behind an integrator's contract, with their name on the purchase order.

Your market

If the site is in one of these four countries, we should talk.

Tell us the country, the capacity and the timeline. If the project is real, you get a bill of materials and a landed price. If it is still on paper, we will say so and stay in touch.

Send a project briefSee the solutions

Reply within two working days