Skip to content
02Solutions

Four things we sell, one accountable supplier.

Optics, cabling, open switching, installation and an energy service. Each can be bought on its own. Bought together, one company answers for the site.

Portfolio
Optics 10G–400G · Open switching · Installation · Energy
Sourcing
Factories in Thailand, Vietnam and Malaysia
Support
Arabic · French · Italian · English
01Supply

Optics and cabling, tested before they leave our hands.

We supply 10G to 400G optical transceivers, direct-attach and active optical cables, MPO/MTP fibre assemblies and copper cabling. Every part is checked for compatibility with the switch or server it plugs into, and every batch is tested and serial-tracked before it ships. Grey-market parts fail; a warranty we cannot honour is worse than no warranty.

LayerWhat we supplyHow it is handled
Optics10G, 25G, 40G, 100G, 200G and 400G transceiversSR, LR, ER and ZR reach; coded for the host platform
CableDAC, AOC, MPO/MTP trunk and harness, Cat6ACustom lengths and labelling on request
SourcingFactories in Thailand, Vietnam and MalaysiaWestern-brand optics available where a buyer excludes Chinese-owned suppliers
TestingPer-batch test and serial recordTest report travels with the shipment
SparesHeld in the regionReplacement in days, not weeks

What testing means here

  • Compatibility check against the host platform before dispatch.
  • Optical power and error-rate test on every batch, not on a sample.
  • Serial number on every unit, recorded in the shipment file so a failure can be traced.
02Supply

Open switches, and an operating system you are allowed to choose.

White-box Ethernet switches from 1G access to 400G leaf and spine, delivered with an open network operating system, so the site is not tied to one vendor's software licence for a decade. We size the fabric, supply the optics that match it, and support the configuration once it is in production.

Form factors
1U leaf and spine switches, 32×100G and 64×400G class
Software
Open NOS: SONiC-compatible, EVPN-VXLAN, standard break-out
Optics
Matched to the switch line and tested as a pair
Support
Configuration, upgrade path, spares and returns
03Install

The part that cannot be shipped in a box.

Cabling, installation labour, labelling, testing and on-site support, delivered by people who are in the country when something breaks. We work under the project's own contractor or as the installation contractor, and we hold spares locally so a failed optic does not wait for a customs clearance.

  1. 01

    Site survey

    Routes, containment, lengths and a cabling schedule before anything is ordered.

  2. 02

    Installation

    Pulling, terminating, labelling and testing to the standard agreed in the brief.

  3. 03

    Handover

    Test results, as-built records and the spares list, in one file.

  4. 04

    Support

    On-site response, spares and returns, in Arabic, French, Italian or English.

04Optimize

A schedule that holds the grid limit when the forecast is wrong.

The first version of the model is a day-ahead robust schedule for a hot-climate data centre. It decides, hour by hour, when deferrable computing runs and how much heat goes to mechanical chillers rather than evaporative cooling. The grid limit is protected in every hour against the full forecast error; cost is protected against the Γ worst hours, which sets how cautious the plan is.

FormulationLP
min   Σ_t c_t (B + x_t + ā_t·m_t + β·e_t) + c_w·w·Σ_t e_t
      + max_{z ∈ U_Γ} Σ_t c_t·α·T̂_t·z_t·m_t

s.t.  Σ_t x_t = E
      m_t + e_t = B + x_t
      w·Σ_t e_t ≤ W
      B + x_t + (ā_t + α·T̂_t)·m_t + β·e_t ≤ P_t
      U_Γ = { z : 0 ≤ z_t ≤ 1, Σ_t z_t ≤ Γ }

The inner maximum is replaced by its dual, so the whole problem stays one linear program.

x deferrable IT load · m heat to chillers · e heat to evaporative cooling · B base load · P grid limit · W water budget · α chiller sensitivity to temperature · Γ hours guarded

How to read the test run

  • The robust plan costs 0.04% more than the forecast-only plan — about US$7 a day on a 10 MW-class site — and never breaches the limit.
  • The 17% saving against the unmanaged case is not a sales claim. That baseline has no evaporative cooling, and the prices and limits are invented.
  • In this run the water budget binds in every plan, and changing Γ moved cost by under 0.1%. The protection came from guarding the grid limit hour by hour.
Robust schedule · test run5,000 simulated days

Days breaching the grid limit

%

01Unmanaged
100%

Flat load, chillers only

02Forecast-only
68%

Optimized on the forecast

03Robust, Γ = 6
0%

Guarded hour by hour

0

grid-limit breaches

US$7/day

cost of robustness, 0.04%

200m³

water per day

Illustrative run: a 10 MW-class site, a Gulf summer day, invented prices and limits. It shows the method, not a saving we promise.

What is still missing

  • Humidity. Evaporative cooling weakens in humid coastal air; the draft uses dry-bulb temperature only.
  • Liquid cooling, batteries and on-site solar — liquid cooling is the priority, because the new Moroccan AI sites are designed around it.
  • Uncertainty in prices and in utility curtailment orders.
  • The networking link: the power drawn by optics and switches is not yet modelled, so the model does not yet close the loop with the hardware we sell.

What a pilot needs from your site

  • One year of hourly IT load, cooling electricity and water use.
  • Chiller performance curves and evaporative system capacity.
  • Tariff, grid connection limit and any curtailment history.
  • The share of workload that can be deferred, and for how long.

What you get

A calibrated model of your site, a month of schedule comparisons against your current operation, and an operating playbook for the hottest weeks — written so the site team can run it without us.

Next step

Send the site, the capacity, the timeline.

A bill of materials and a landed price for the hardware. A survey and a labour estimate for the installation. A pilot scope if the site runs hot.

Send a project briefSee the markets

Reply within two working days